Links - Verweise

  |  

Sie sind hier:  >> English  >> Our Church building  >> Befor the rennovation 


Befor the rennovation

Water driped into the church when it rained. We could replace the entire roof until end of August 2002 But the church is still in need of repairs .Plaster from the walls is falling off, and the wooden floor is deteriorating, so it is difficult to clean. The walls need to be replastered and painted, and window frames, doors and the wooden floor need to be replaced. New electrical wiring also urgently needs to be run while the walls are exposed, because the whole system is very old and the church could burn down. Also we do not have a currently heating system.

 

Sie müssen Ihren Flash-Player aktualisieren.

Klicken Sie hier, um Ihren Flash-Player zu aktualisieren.

 

Links - Verweise

  |